FILIPPOI – NEA SANTA

GREECE

2006 – 2008
Public Power Corporation, PPC

Project for the construction of the 400 kV overhead transmission line – direct current – named “Filippoi – Nea Santa” and of the 400 kV overhead transmission line – alternate current – named “Nea Santa – Turkey” for a total lenght of 210 Km.