Project for the construction of the 380 kV – double circuit twin conductor – overhead transmission line, named “Sudburgenland – Wien Sudost” for a total length of 37 Km.
The project included also the dismantling of the existing 220 kV overhead transmission line.
Works have been executed properly by complying with the complex technical and environmental standards in force in Austria.
SUDBURGENLAND – WIEN SUDEST
AUSTRIA
1997-1999
Verbund - Austrian Power Grid GmbH